CEO Video Update: Phase 2 Drilling Expands Mineralization at Juby Gold Project

Watch CEO Mark Trevisiol discuss early Phase 2 diamond drilling results from our flagship Juby Gold Project in the Abitibi Greenstone Belt. The latest assays confirm strong mineral continuity, extend gold mineralization below the current resource pit shell at Golden Lake, and expand the footprint of the near-surface 826 Zone.

Key Exploration Takeaways

  • Broad Gold Mineralization at Golden Lake: Intersected 163.10 metres grading 0.68 g/t gold (GL26-96), including higher-grade sub-intervals of up to 2.18 g/t gold.
  • Expanding Past Current Pit Limits: Confirmed strong mineral continuity 70 metres from previous drilling, extending gold mineralization below the current resource pit shell to deepen the open-pit potential.
  • High-Grade Discovery at Depth: Returned 15.50 metres grading 2.00 g/t gold (GL26-89)—including 5.95 metres of 4.18 g/t gold—opening new targets for follow-up drilling.
  • 826 Zone Strike Extended 200 Metres: Step-out drilling expanded near-surface mineralization to the northwest with shallow hits including 11.00 metres of 2.13 g/t gold.
  • Active Winter Exploration: Three diamond drill rigs are operating through the winter under the fully funded 50,000-metre Phase 2 program.

Note: For complete assay composites, collar coordinates, QA/QC protocols, and Qualified Person disclosures, please refer to the full press release.